Skip to content
IncentivesMap
New HampshireRebate Program

Commercial & Industrial Solar Rebate Program

You getNew PV systems less than or equal to 500 kW AC: $0.20/W New Solar Thermal systems with 15 or fewer collectors: $0.12/rated or modeled kBtu/year New Solar Thermal systems with more than 15 collectors: $0.07/rated or modeled kBtu/year
Apply on official siteView on DSIRE

Quick facts

Incentive type
Rebate Program
Amount
New PV systems less than or equal to 500 kW AC: $0.20/W New Solar Thermal systems with 15 or fewer collectors: $0.12/rated or modeled kBtu/year New Solar Thermal systems with more than 15 collectors: $0.07/rated or modeled kBtu/year
Administrator
New Hampshire Department of Energy
Funding source
RPS alternative compliance payments
Applies to
State, Commercial, Industrial, Local Government, Nonprofit, Schools, State Government, Federal Government, Tribal Government, Agricultural, Institutional
Technologies
Solar Photovoltaics, Solar Water Heat, Solar Space Heat, Solar Thermal Process Heat

Dates

Start date
2010-11-01
Source last updated
May 30, 2025

About this incentive

The New Hampshire Public Utilities Commission initiated a new solar rebate program for non-residential applicants in November 2010. Funded by alternative compliance payments under the state's renewable portfolio standard (RPS), this program supports solar photovoltaic (PV) and solar-thermal installations. In 2021, the New Hampshire DOE was given the administration and implementation authority over RPS policy and related renewable energy fund (per H.B. 2 ). Installations must be located in the state of New Hampshire, and the facility must be served by an investor-owned utility or rural electric utility that is required to comply with the state's RPS (municipal utilities are not required to comply with the state's RPS, and therefore their customers are not eligible for this program). Systems owned by third parties and sited on eligible customer premises are eligible. Applicants must first reserve incentive funding. In addition, applicants must complete a "Level II" energy audit. Only qualifying systems installed on or after November 1, 2010, are eligible. This program will operate on a year-by-year basis or until funding is exhausted, whichever comes first. See the program website (listed above) for application materials, budget status, and additional program details.

Data updated . Always confirm details on the official program website before applying. Programs change frequently.