CaliforniaFeed-in Tariff
LADWP - Feed-in Tariff (FiT) Program
You getVaries by technology and location. See table below.
Apply on official siteView on DSIRE
Quick facts
- Incentive type
- Feed-in Tariff
- Amount
- Varies by technology and location. See table below.
- Program budget
- 100 MW of Projects
- Applies to
- Utility, Commercial, Residential
- Technologies
- Solar Photovoltaics
Dates
- Start date
- 2013-02-01
- Source last updated
- March 20, 2026
About this incentive
Through the Feed-in Tariff (FiT) program, LADWP is purchasing energy for up to 20 years from solar PV and non PV technologies through a standard offer power purchase agreement. Participating in the program conveys to the utility all energy, capacity rights, and environmental attributes associated with the project. As of March 2025, the price per kWh varies as shown below: Project Capacity In-Basin PV In-Basin Non-PV Owens Valley PV 30 kW - 500 kW $0.145 per kWh $0.115 per kWh $0.115 per kWh > 500 kW - 3 MW $0.140 per kWh $0.110 per kWh Not Available > 3 MW $0.135 per kWh $0.105 per kWh Not Available