Texas EV
1111 verified programs, updated 2026-08-08. 1 incentive type.
Texas-New Mexico Power Company - Residential and Hard-to-Reach Standard Offer Programs
Rebate ProgramUtility, Residential, Low Income ResidentialNovember 3, 2025
2025 Program Manual Note: “Res” = Residential Standard Offer Program; “HTR” = Hard-to-Reach Program (typically offers higher incentives for low-income or rural households). Primary Measures — Paid by Verified Savings Ceiling/Wall/Floor Insulation (Gas): Res $480/kW + $0.25/kWh; HTR $538/kW + $0.30/kWh Ceiling/Wall/Floor Insulation (Electric): Res $440/kW + $0.24/kWh; HTR $493/kW + $0.28/kWh Attic Encapsulation (Gas): Res $384/kW + $0.20/kWh; HTR $430/kW + $0.24/kWh Attic Encapsulation (Electric): Res $352/kW + $0.19/kWh; HTR $394/kW + $0.22/kWh Duct Sealing (Alt Approach): Res $175; HTR $250 (flat) Air Infiltration (HTR only): HTR $275 + $0.11/kWh All Other Measures (>10 yr EUL): Res $225 + $0.07/kWh; HTR $270 + $0.11/kWh HVAC System Replacement — Replace on Burnout & New Construction SEER2 15.2–17.19: Res $50/ton · $1,400/system (HP→ERH); HTR $125/ton · $1,900/system (HP→ERH) SEER2 17.2–19.99: Res $150/ton · $1,500/system (HP→ERH); HTR $225/ton · $2,000/system (HP→ERH) SEER2 20+: Res $225/ton · $1,700/system (HP→ERH); HTR $325/ton · $2,200/system (HP→ERH) Multifamily Units: Res $1,000/system; HTR $1,300/system HVAC System Replacement — Early Retirement SEER2 15.2–17.19: Res $125/ton · $1,800/system (HP→ERH); HTR $225/ton · $2,300/system (HP→ERH) SEER2 17.2–19.99: Res $200/ton · $2,000/system (HP→ERH); HTR $300/ton · $2,500/system (HP→ERH) SEER2 20+: Res $300/ton · $2,200/system (HP→ERH); HTR $400/ton · $2,700/system (HP→ERH) Multifamily Units: Res $1,300/system; HTR $1,500/system Mini-Split Systems (per ton) Replace on Burnout — HP & A/C: $75 - $350 Replace on Burnout — HP replacing ERH: $250 - $600 Early Retirement — HP & A/C: $150 - $400 Early Retirement — HP replacing ERH: $350 - $750 New Construction — HP & A/C: $75 - $350 Heat Pump Water Heaters (ENERGY STAR®) ≤55 gal: Res $400; HTR $500 >55–120 gal: Res $50; HTR $100 HVAC Tune-Up (Deemed Savings) Res $55; HTR $55 Secondary Measures Advanced Power Strip (APS): Res $30; HTR $35 Small APS (PowerTap): Res $15; HTR $15 General Service LED: Res $3.00/lamp; HTR $3.00/lamp Faucet Aerator: Res $3.50; HTR $4.50 Low-Flow Showerhead: Res $35; HTR $45 Water Heater Pipe Wrap: Res $5; HTR $10 Smart Thermostat (Single-family): Res $125; HTR $175 Smart Thermostat (Multifamily): Res $50; HTR $65 Solar / Energy Storage / EVSE (with Solar) PV (DC-STC size): 3–4.999 kW $1,250; 5–7.499 kW $2,200; 7.5–30 kW $2,750 Energy Storage (with Solar): $1,000 Level 2 EVSE (with Solar): $500 Max per Customer: $4,250; Max per Premise: $4,250
CPS Energy (Electric) - Residential Energy Efficiency Rebate Program
Rebate ProgramUtility, Residential, Installers/ContractorsJune 2, 2025
Wifi Thermostat: $85 Central AC/Heat Pump: $90 - $310/ton, varies by efficiency rating Window AC Units: $15 - $25 Pool Pumps: $150/HP, up to $450 Attic Insulation: $0.25 - $0.35/SF Solar Water Heater: $0.60/annual kWh savings LED In-Store Discount: Varies Cool Roof: $0.08 - $0.20/SF Electric Outdoor Equipment: $15 - $60 Level 2 EV Charging Station: $250 Solar: See website
Denton Municipal Electric - Residential GreenSense Energy Efficiency Rebate Program
Rebate ProgramUtility, ResidentialSeptember 25, 2025
HVAC: $1500 - $2500/unit HVAC Mini Split: 30% up to $750 HVAC Tune Up: 100% of invoice, up to $100/unit Smart Thermostat: 100% of invoice, up to $100/unit Weatherization Materials: 100% of invoice, up to $100 Radiant Barrier: 20% of invoice, up to $300 Attic Insulation: 50% of invoice, up to $1500/unit Air Duct: 30% of invoice, up to $400/unit Solar Screens: 50% of invoice, up to $500/unit Windows: 30% of invoice, up to $1500/unit Solar Water Heater: 30% of invoice, up to $300/unit Heat Pump Water Heater: 30% up to $300 E-Bike: 50% of invoice, up to $750 Electric Vehicle: $1,000
United Cooperative Services - Residential Energy Efficiency Rebate Program
Rebate ProgramUtility, ResidentialOctober 14, 2025
Air Source Heat Pump: $200 Geothermal Heat Pump: $200/ton Heat Pump Electric Water Heater: $150/unit Attic Insulation (Retrofit): $0.02/inch per sq ft HVAC Tune-Up: $75 Electric Vehicle Charger: 50% of cost, up to $250/unit Smart Thermostat: up to $50
Guadalupe Valley Electric Cooperative - Residential Energy Efficiency Rebate Programs
Rebate ProgramUtility, Residential, CommercialOctober 13, 2025
Heat Pumps/Air Conditioner: $650 (18+ SEER) Level-2 EV Charging Station (Residential): Least of $600 or 50% of costs Level-2 EV Charging Station (Commercial): Least of $3000 or 50% of costs Peak-Time Thermostat Program: One-time $85 bill credit with additional $30 per year (through September 30) Peak-Time Existing Battery Program (Initial): $75 per installed kilowatt of rated capacity Peak-Time Existing Battery Program (Annual): $75 per installed kilowatt of rated capacity, calculated as an annual amount, then prorated and applied as a monthly bill credit Peak-TIme New Battery Program (Initial): $220 per installed kilowatt of rated capacity Peak-TIme New Battery Program (Annual): $75 per installed kilowatt of rated capacity, calculated as an annual amount, then prorated and applied as a monthly bill credit
Austin Energy - EV Charging Station Rebate Program
Rebate ProgramUtility, ResidentialJune 12, 2025
Open Charge Point Protocol Level 2 charging stations: $1,200 Non-Open Charge Point Protocol Level 2 charging stations: $900
Austin Energy - Multifamily EV Charging Station Rebate Program
Rebate ProgramUtility, Multifamily ResidentialJune 12, 2025
EV Charging Stations EV-Dedicated Level 1: Up to $700 per charging station Installed Level 2: Up to $3,000 per charging station installed DC Fast Charging: Up to $5,000 per charging station installed
Austin Energy - Workplace EV Charging Station Rebate Program
Rebate ProgramUtility, CommercialJune 12, 2025
EV Charging Stations EV-Dedicated Level 1: Up to $700 per charging station Installed Level 2: Up to $3,000 per charging station installed DC Fast Charging: Up to $5,000 per charging station installed
Entergy Texas - EV Charging Station Rebate Program
Rebate ProgramUtility, Commercial, ResidentialJune 12, 2025
Level 2 EVSE: $250 per plug DC Fast Charger: $750 – $1,500/plug Electric Forklifts: $250 Electric Golf Cart: $150
SWEPCO - EV Residential Charging Station Rebate Program
Rebate ProgramUtility, ResidentialJune 12, 2025
$250
United Cooperative Services - EV Charging Station Rebate Program
Rebate ProgramUtility, ResidentialJune 12, 2025
50% of cost